TNO Picarro5310 ICOS NRT Level 1 N2O at 27m at Cabauw
Dataset: TNO Picarro5310 ICOS NRT Level 1 N2O at 27m at Cabauw | |
---|---|
title | TNO Picarro5310 IN2OS NRT Level 1 N2O at 27m at Cabauw |
description | Automatically-produced, daily-growing (by data object deprecation) data on molar fraction of atmospheric N2O. The data starts from the last respective L2 release. |
type See Dataset Types' descriptions in Dataset type taxon descriptions | In-situ Observation |
format | ASCII |
served by data service | ICOS Data Portal |
landing page | https://meta.icos-cp.eu/objects/BRYxf0p-sLlO178yR5DEeJzU |
PID | |
license | CC BY 4.0 |
contact person | Arnoud Frumau |
creator | Arnoud Frumau |
organization | TNO |
Geographic and Temporal Information | |
---|---|
location | Cabauw |
geographic coordinates | 51.9703 N, 4.9264 E |
elevation (meters) | 0.00 m <br /> |
start date | 2025-04-01 |
end date | 2030-01-01 |
Campaigns that contribute to Dataset | |
---|---|
Related Media to TNO Picarro5310 ICOS NRT Level 1 N2O at 27m at Cabauw | |
---|---|
ICOS Near Real-Time (Level 1) Atmospheric Greenhouse Gas Mole Fractions of CO2, CO and CH4, growing time series starting from latest Level 2 release
Cabauw station follow the ICOS Atmospheric Station specification V2.0 (https://doi.org/10.18160/GK28-2188) and are certified as ICOS atmospheric stations Class I or II. Data processing has been performed as described in Hazan et al., 2016 (https://doi.org/10.5194/amt-9-4719-2016).
Frumau, A., Hensen, A. (2025). ICOS ATC NRT N2O growing time series from Cabauw (027.0 m), 2025-04-01–2025-07-08, ICOS RI, https://hdl.handle.net/11676/BRYxf0p-sLlO178yR5DEeJzU
Disclaimer: Near Real-Time (NRT, Level 1) data is not the final highest quality ICOS data. This data is generated using only completely automated quality control procedures. These NRT time series are generated within 24 hours after measurement and will not be updated later using improved information or become completed with missing data. For your analysis and publications we recommend to use the final completely quality controlled and flagged (Level 2) data that is released with a delay between 6-12 months, that includes all corrections and maximum completion of missing data